The Roof is on!!!
It is like Christmas Day - something new is put on the garage everytime I get home from work this week. Yesterday it was the frame of the garage - today is the roof and putting in of the door. Wonder what tomorrow will bring?? I saw the shingles for the roof lying by the garage - so I wonder if that is the next step. I know with the electrical trench dug that the electrical connections will be made soon. Then the city inspectors have to come and make sure everything is okay, then the trench can be plowed over. Gather from there it would be the siding. I am not doing installation or drywall at this point (that is extra $$$). I can always do that later plus with friends in the trade field I am sure they can help me with what I will need to do that all.
2 Comments:
Looks GREAT!
I hadn't checked for a few days, holy cow! wish my building could go that fast! I was all excited because it only took 3 days to build the septic tank. YOu must be VERY happy...Rose
Post a Comment